An outdoor kitchen is one of the most popular projects for homeowners in South Florida. The climate allows for year-round outdoor cooking, and a well-designed project not only increases comfort, but also the market value of the property. But before you start buying equipment and planning grill parties, it is important to understand how long it will actually take to build an outdoor kitchen – from the first sketch to the final bolt.
The time frame depends on a number of factors: the size of the structure, the composition of the materials, the characteristics of the site, weather conditions and, of course, the experience of the contractor. In this article, we will provide a practical overview, compiled from real projects in Hallandale Beach, so that you can accurately plan your time, budget and choose the right construction format.
What does the deadline of outdoor kitchen construction depends on
The time it takes to build an outdoor kitchen depends not only on the area, but also on a whole range of technical and organizational issues that affect the duration of the work.
Site size and number of elements
The larger the area and the more complex the structure, the longer the installation takes. For example, a compact kitchen with one burner and a sink can be built in just a couple of weeks. But a full-fledged L-shaped area with a bar counter, built-in refrigerator, sink, grill, smokehouse and wood-burning stove takes much more time. Especially if each element must be connected to its own utilities – water, gas, electricity. Increasing the number of modules automatically increases the number of technical operations, and therefore the deadline for the project.
Materials for framework and finishing
The speed of assembly depends greatly on what the kitchen is being built from. Lightweight concrete blocks with porcelain stoneware or composite facings are installed relatively quickly. This is a standard set for most ready-made solutions. But brickwork, natural stone, plaster and decorative panels require not only careful installation, but also time to dry, especially in high humidity conditions.
Mortar and adhesives can dry longer than in the north, which means that technological pauses are possible between stages so as not to risk the quality of the finish.
Technical networks
If the house already has gas and drainage, the installation will proceed like clockwork. Add the transfer of the panel with sockets, lighting, a water filter – and the communications stage stretches out for a couple of days. In Hollywood FL, they like electric grills, and in Aventura, the owners more often order gas – the set of licenses for craftsmen changes.
Site preparations
If you already have a level deck or a concrete slab with waterproofing, that’s a great start. But if you’re building a kitchen from scratch on open ground, especially on unstable or sandy soil, you’ll need to do some extra preparation. In sloping areas like Sunny Isles, you may need to install a reinforced foundation, install bored piles, and level the site. This step alone can take up to a week, especially if it rains or is difficult to get equipment in.
Individual design
An individual outdoor kitchen project with 3D visualization is good because you can see the result in advance. But any unique solution means non-standard countertops, fittings, built-in elements that you need not only to choose, but also wait for delivery. Even if the kitchen is visualized in 3D and all the dimensions are known in advance, production and delivery can take up to several weeks. Therefore, a competent contractor of outdoor kitchens begins designing at least a month before the start of construction.
The average estimate of an outdoor kitchen
Speaking of examples, in the practice of inoutconstructioninc.com, a basic outdoor kitchen (grill, sink and small bar area) is built in an average of 3-4 weeks. The area of these contraptions, as a rule, does not exceed 100-120 square feet, and the design is based on standard materials and already proven solutions.
But it is worth adding to this natural stone cladding, a built-in refrigerator, a storage area, a lighting system or decorative elements – and you immediately reach a period of 5-6 weeks, even if all processes are clearly organized. This is a real period for an expanded outdoor kitchen with an individual design and finish, when technological pauses for drying, connecting communications and installing equipment are taken into account.
It is important to understand: all calculations imply that the materials are already available. Therefore, most often it is not the installation itself that “slows down”, but logistics. For example, imported grill systems and burners, especially from Europe, often get stuck in ports or are delayed by 2-3 weeks. The same goes for custom countertops and hardware. If you want to meet the deadline, make sure in advance that all equipment:
-
- either has already been delivered to Miami;
-
- or is ordered from a local supplier.
How to speed up the process
To ensure that the installation of an outdoor kitchen does not drag on for the entire season, it is important to think through everything in advance. The most reliable way is to choose the format before the start. A clear project of an outdoor kitchen with a grill at the sketch stage helps not only to decide on the location of the zones, but also to immediately purchase equipment and finishing materials, which significantly reduces downtime in the process.
It is equally important to check the site in advance. If you plan to repair an old terrace in the backyard, move sockets or prepare utility points, it is better to do all this before the main team arrives. Such preliminary work saves up to 20% of time, especially if we are talking about tight deadlines.
The rest is a matter of coordination. When one contractor carries out the installation of an outdoor kitchen on a turnkey basis, he is responsible for the design, procurement and logistics. Therefore, delays during work switching hands can be practically eliminated. This approach provides maximum efficiency: all team members are aware of the tasks and work according to a single schedule, without “passing the buck”.
Why you should choose In Out Construction Inc.
There are many reasons:
-
- License and insurance. The work is carried out officially, in compliance with all standards and requirements, so there will be no surprises with inspections or delays due to missing documents.
-
- The team speaks four languages (English, Russian, Spanish, Hebrew). If you need a Russian-speaking builder in Florida, you will be able to communicate directly, without intermediaries and translators at all stages of the project (from measurements to acceptance).
-
- Full cycle – real turnkey construction in Hallandale. The company takes care of everything: design, foundation, gas, electricity, finishing and final cleaning. One manager leads the entire process, and the work schedule is fixed from the very beginning.
-
- Climate experience. Specialists know how an outdoor kitchen area should be arranged so that it can withstand the sun, salt, humidity and does not lose its appearance after a season. Proven materials and solutions are used that are resistant to UV radiation and corrosion.
Frequently asked questions
How long does the construction take during a rainy season?
With proper tenting, you can meet the standard deadlines, but take into account the pauses for drying adhesives – plus 2-3 days.
Is it possible to build in a dishwasher?
Yes, but you will need a drain into the storm system and a GFCI outlet. Keep in mind: household appliances on the street require a model with moisture protection.
What is more profitable: a modular system or a custom one?
Modules are faster, but an outdoor kitchen with a barbecue of an individual layout fits perfectly into the landscape and increases the value of the property.
Do you need a permit to install an outdoor kitchen?
Yes, if the project includes gas, plumbing or electricity. A licensed contractor will arrange everything for you – especially important when building an outdoor kitchen in residential areas of Broward County.
What is the difference between a grill kitchen in the courtyard and a classic terrace with a barbecue?
A grill kitchen in the yard is a permanent structure with utility lines, resistant to weather conditions. Unlike temporary solutions, it is integrated into the area and increases the comfort of everyday cooking outside.
Conclusion
So, the answer to the question “how long does construction take?” is from three to six weeks, depending on the complexity, site preparation and logistics of materials. Choose an experienced contractor in Florida, approve the project in advance, and next month fresh langoustines will be sizzling on the stove in the open air.
Leave a request for a free consultation with the specialists at In Out Construction Inc. We will calculate the time frame and budget specifically for your site, and at the same time share life hacks on the use of the kitchen area in a tropical climate. Your yard is ready for an upgrade – let’s build a dream together!